Federal Savings Bank, Bronx, NY
Provide support for new grade beam foundation system in existing 1-story building to be converted into a bank. Previous floor slab had experienced severe settlement. A subsurface investigation found voids varying in size, as well as miscellaneous fill underlain by a peat and clay layer, underlain by a silty sand later. They concluded that the slab on grade foundation settled due to consolidation of misc. fill and organic material. The piles were installed to 25 tons with a Gehl Skid Steer.
Project Name and Location:
City and Suburban Federal Savings Bank, Bronx, NY
City and Suburban Federal Savings Bank, Bronx, NY
Project Date:
November 2006
November 2006
Project Type:
Existing Structure Rehabilitation and Change of Use
Existing Structure Rehabilitation and Change of Use
Piles Specification:
(18) 8"x10" helical piles were installed and connected to 6"x6" pile caps.
(18) 8"x10" helical piles were installed and connected to 6"x6" pile caps.
Soil & Embedment Depth:
The piles were installed to a depth of 17' to 42'
The piles were installed to a depth of 17' to 42'
Project Timeline:
1 day
1 day